翻訳と辞書
Words near each other
・ Lake Shafer
・ Lake Shala
・ Lake Shangrila, Wisconsin
・ Lake Shannon
・ Lake Shaokatan
・ Lake Sharpe
・ Lake Shasta Caverns
・ Lake Shaster
・ Lake Shawnee
・ Lake Shawnee (New Jersey)
・ Lake Shawnee, West Virginia
・ Lake Shegue
・ Lake Shelbyville
・ Lake Shenorock
・ Lake Sherburne
Lake Sherburne Dam
・ Lake Sherwood
・ Lake Sherwood (Kansas)
・ Lake Sherwood (West Virginia)
・ Lake Sherwood, California
・ Lake Sherwood, Wisconsin
・ Lake Shetek
・ Lake Shetek State Park
・ Lake Shikotsu
・ Lake Shinji
・ Lake Shipp
・ Lake Shira
・ Lake Shirwa
・ Lake Shore
・ Lake Shore & Michigan Southern Freight Depot (Westfield, New York)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Lake Sherburne Dam : ウィキペディア英語版
Lake Sherburne Dam

Lake Sherburne Dam is a high compacted earthfill dam built between 1914 and 1921 built just outside the boundary of Glacier National Park, Montana, its reservoir extending into the park. The dam impounds Swiftcurrent Creek as it flows out of the park.〔(【引用サイトリンク】url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=Lake+Sherburne+Dam&groupName=Overview )〕 Water stored in Lake Sherburne is released to flow down Swiftcurrent Creek to the St. Mary River, from which it is diverted to the Milk River, flowing through Canada for before returning to the United States. Use of these waters is governed by the Boundary Waters Treaty of 1909. Water from the Milk River is used for irrigation in north central Montana.〔(【引用サイトリンク】url=http://www.usbr.gov/projects/Project.jsp?proj_Name=Milk%20River%20Project )
==Construction==
The principal storage facility for the Milk River Project was initially intended to be a dam on the St. Mary Lakes (Upper St. Mary Lake in Glacier National Park and Lower St. Mary Lake just east of the park), but no suitable damsite could be found. The Sherburne Lakes in Swiftcurrent Valley were selected as an alternate site, with work beginning in 1914. Building material was borrowed from the upper end of the Sherburne Lakes. In order to expedite transportation of materials, a small tug boat and several barges were purchased for $1900 and hauled overland from Seattle to the project site. Work continued through 1915 and 1916. Swiftcurrent Creek was diverted through the dam's outlet works in April 1916. Work was hampered by delays from spring flooding. The outlet tower and gatehouse were built in 1917, together with the spillway. In October observations indicated that the spillway was being displaced by a slide originating in a hill to the north of the spillway. Drainage of lakes above the slide did not cure the problem. Work on the dam and its control works continued through 1918, but the spillway problems continued. Water storage began in 1919. Eventually the spillway walls and floor were built of wood timbers to allow for movement. Work was complete in 1921. As originally built, Lake Sherburne impounded behind the dam.
In 1960 the original spillway at the north end of the dam was filled in, victim of continuing slide activity, and a new spillway was built, using a circular overflow of the "morning glory" type out in the lake, discharging into the lower portion of the outlet works. The dam's crest was raised to prevent overtopping during the projected maximum flood condition. A wall, high, was built on top of the dam using interlocking concrete units set apart, with the space between filled with compacted earth, the first example of this technique to be used by the Bureau of Reclamation. The outlet works and spillway were raised at this time.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Lake Sherburne Dam」の詳細全文を読む